Hard water iscosting you.We fix that. Permanently.
The people who understand
your water problem.

Dr. Priya Mehta
Water Chemist, M.Sc. (IIT Bombay)
18 years in industrial water quality
Surat's borewell aquifers draw through limestone and dolomite strata, emerging with TDS levels routinely between 1,400 and 2,200 ppm — nearly four times the BIS safe limit. Calcium carbonate deposits at 60°C, which is exactly where your boiler feed water lives. Without intervention, every monsoon season adds 3–5mm of scale to heat-transfer surfaces. That's not a maintenance problem. That's a capital erosion problem.
1,840 ppm
avg. Surat TDS
3–5mm
scale per monsoon season
18%
boiler efficiency loss at 3mm scale
What untreated water costs you.
Quarter by quarter.
This table doesn't compare features. It compares the cost of inaction. Every row is a line on your P&L. Hover any row to hear from the expert who measured it.
| Metric | Raw BorewellNo treatment | Basic FiltrationSediment only | Competitor SystemGeneric softener | Soften SystemFull resin-bed + RO |
|---|---|---|---|---|
TDS Level ppm | 1,600–2,200 | 1,400–1,900 | 400–600 | < 50BIS IS 10500 compliant |
Water Hardness mg/L as CaCO₃ | 850–1,200 | 750–1,000 | 150–250 | < 10Zero scale guarantee |
Annual Boiler Maintenance Cost ₹ per boiler | ₹3.8L–₹5.2L | ₹3.2L–₹4.5L | ₹1.8L–₹2.6L | ₹22,000AMC included |
Fabric Rejection Rate % of output | 6–9% | 5–7% | 2–3% | < 0.3%Industry benchmark: 1% |
Contract Response Time hours to site | N/A | 48–72 hrs | 24–48 hrs | 4 hrsSurat & GIDC zones |
| Click any row to hear expert context |
Ready to see your plant's numbers?
A water audit takes 90 minutes and delivers a full cost-of-inaction report for your facility.
Your industry. Your numbers.
Your decision.

Textile & Dyeing Mills
Ring Road / Pandesara GIDC
Primary issue: Boiler scaling, dye rejection, steam quality
Avg. annual descaling spend
₹4.8L / boiler
Fabric rejection from hard water
6–9% output
Steam efficiency loss at 4mm scale
22% increase in fuel
After Soften: rejection below 0.3%, descaling AMC at ₹22,000/yr

Diamond Polishing Units
Varachha / Katargam
Primary issue: Silica deposits on polishing wheels, coolant contamination
Wheel replacement from silica abrasion
2× faster wear
Coolant contamination downtime
18 hrs/month avg.
Yield loss from surface scratching
3–4% per batch
After Soften: wheel life extended 2.3×, coolant circuit clean for 6+ months
Residential Towers
Pal / Vesu / Adajan
Primary issue: Spotted glassware, dry skin complaints, geyser failures
Avg. resident complaints / month
14 per 100 flats
Geyser element replacement cost
₹800–₹1,400 / unit
Society maintenance escalation
3× per year
After Soften: complaint rate drops to <1/month, geyser life 4+ years
Real facilities. Real savings.
Real Surat.
We were descaling three boilers every monsoon — ₹14L gone before production even stabilized. Soften's resin-bed system ended that. We're 22 months in, one AMC visit, and our boiler efficiency is up 19%. That's not maintenance savings. That's capital recovery.
₹12.8L
Annual saving
8
ROI month

Nileshbhai Patel
General Manager, Operations
Shreeji Dyeing & Printing, Pandesara GIDC
The society was getting 40 complaints a month about spots on new RO installations and dry skin. Residents were threatening to withhold maintenance. We installed Soften's residential system for 180 flats. Complaints are now in single digits. The AGM was the first quiet one in three years.
94%
Complaint reduction
2 days
Install time

Smt. Hemlata Shah
Chairperson
Tapi Residency CHS, Adajan
We negotiate AMC contracts for 14 units in the Sachin GIDC campus. Previous vendor response time was 36–48 hours — that's two production shifts lost per incident. Soften's 4-hour SLA has held for 18 months. It's now in our vendor scoring matrix as a benchmark.
100%
SLA compliance
14
Units on contract

Arvind Kulkarni
Procurement Head
Sachin Industrial Estate, GIDC
BIS IS 10500
Certified
WQA Gold Seal
Certified
200+ Industries
Surat & GIDC
18 months
Avg. contract tenure
4-hr SLA
Emergency response
Know exactly what your water is costing you.
Before you spend another rupee.
A Soften plant audit takes 90 minutes on-site. Our water chemist tests your borewell source, inspects scaling on heat-transfer surfaces, and delivers a written cost-of-inaction report with ROI projections specific to your facility.
Full TDS and hardness profile of your borewell source
Scaling assessment on boilers, pipes, or polishing circuits
Quarterly cost-of-inaction estimate in ₹
System recommendation with capital and AMC cost breakdown
Written report within 48 hours of audit
Secondary Resource
Industrial Case Studies
12 documented case studies across textile, diamond, and residential sectors. TDS readings, cost data, and system specs included.